TopoContourDXF

LightBurn topographic map layers

Export a millimeter SVG stack with elevation-specific paths, shared registration geometry and a slice manifest. In LightBurn, map each color to the intended operation before arranging the sheets. Preview free. Three exports cost $14.99.

Terrain viewport

Terrain sheet
Loading terrain…Synthetic DEM
Elevation range—
Index / minor—
Polyline vertices—

Elevation profile

A — A′
48%

Slope distribution

% GRADE

Free proof

Download a watermarked plan or the five highest contour elevations.

PROFESSIONAL EXPORTS

Pro Preview

DXF / SVG / GIS

Project pack 3 exports
CAD Pro Unlimited
Engineering Studio Unlimited

Treat each elevation as a physical part

A contour map contains lines, but a cut stack consists of material that remains on one side of a boundary. A closed hilltop ring usually encloses material above its threshold. A depression can reverse that relationship. At the edge of a crop the material boundary can follow the frame for part of its length. Inspect the shape of the slice as a whole before assigning a cutting process to every visible contour.

The terrain interval and material thickness control different dimensions. One specifies how many ground elevations are represented. The other sets the rise between assembled layers. At one to one thousand, a two meter ground interval corresponds to two millimeters of true-scale rise. Using three millimeter stock for those layers gives a vertical exaggeration of one and a half. That can be desirable for a shallow basin, provided the label states it.

Preview the lowest, middle and highest slices together before nesting the parts. The lowest sheet usually defines the broad footprint. Intermediate sheets can carry isolated ridges and pin holes, while the summit may consist of a piece small enough to move or disappear during handling. A legible manifest and a test fit solve different problems and both belong in the fabrication handoff.

LightBurn layer and operation vocabulary

ParameterSpecification
Assignment controlColor Palette
Process setupCuts / Layers
Vector travel modeLine
Area marking modeFill

Worked examples

A registration test in offcuts

Cut two small trial pieces containing the same pair of registration holes as the intended stack. Slip them over the pins and turn the assembly sideways. If the edges bind or the layers can rotate enough to misalign a ridge, adjust the fabrication setup before cutting the complete relief.

A line that belongs to an engraving pass

A slice number on the underside lets an assembler distinguish two nearly identical mid-slope pieces. Assign the label geometry to the intended marking operation and verify the preview. If the label is assigned to a through-cut layer, characters can break into the terrain or release small loose pieces.

A scale check using a reference width

A 200 meter footprint at one to two thousand should occupy 100 millimeters. Measure the corresponding outline in LightBurn after import. If it measures something different, investigate SVG units and import scale first. Changing only the pin spacing to fit a jig would leave the terrain itself out of scale.

Working procedure

  1. Set the relief specification. Choose the area, map scale, terrain interval and measured sheet thickness. Estimate the physical stack height before exporting. Thin islands, narrow isthmuses and near-touching outlines deserve review at finished size. An appealing plan on screen may contain details narrower than a practical strip of the chosen material.
  2. Inspect imported operation colors. Open the SVG and examine each operation in the Cuts / Layers window. Assign line cutting to the through outlines and appropriate marking to the index information. Preview their travel separately. A color identifies a layer, while the processing settings on that layer determine what the laser actually does.
  3. Keep the registration relationship. Arrange slices within the usable bed, moving each set of outline, holes and marks together. If parts must be split across jobs, retain an identical origin convention within each slice. Check that isolated summits have an assembly reference once the surrounding waste material has been removed.
  4. Check a representative slice. Use scrap from the actual material batch for the first test. Inspect hole fit, surviving narrow features and whether you can read the identifier after finishing. Choose machine settings using the qualified material and shop procedure. Then review the entire job preview for extra passes or duplicate outlines.

When to use this workflow

Repeated relief editions

A common pin layout and a legible stacking order allow several copies of the same terrain to be assembled consistently. Keep the manifest together with a reference photograph or proof. Record any kerf adjustment made in LightBurn so a later run can be compared fairly with the original.

A multi-sheet teaching model

A classroom model may need layers that lift apart for inspection. Test the registration fit for repeat assembly and keep labels readable when the terrain is separated. A stack intended for permanent adhesive can tolerate a different fit, so decide how it will be handled before finalizing the holes.

Technical questions

Does LightBurn choose cutting power from an SVG color?

A color groups vector geometry into a layer. The layer's mode and machine-specific settings determine the actual process. Review the assigned operations with the correct device and material selection. Geometry files cannot account for the condition of your optics, actual sheet thickness or local shop setup.

Why do some slopes become separate pieces at higher levels?

A connected landform can divide into independent islands above the contour that joins its ridges. Keep those pieces identified by level and position. A placement template or the underlying engraving can help align them when their individual outlines do not contain the common registration holes.

When should engraving happen relative to cutting?

Check the proposed operation order in LightBurn and consider which operations need the sheet to remain fixed. Marking a piece while it is still held in the larger sheet can improve registration. Small internal features also deserve review before a final perimeter releases the larger part.

Does a stack of ten sheets reproduce ten elevation intervals?

Ten sheets have ten physical thicknesses, while the top surfaces of the first and tenth sheets differ by nine thicknesses. A base layer and any backing change the total height again. State whether you are measuring the assembled object or the elevation difference between two terrain surfaces.

Terrain workflows